一级做a爰片性色毛片成人久久久国产一级a毛|欧美激情国产精品视频一区二区|婷婷综合尤物精品国产|91香蕉亚洲精品人人影视|亚洲精品免费日日日夜夜夜夜|亚洲永久精品免费www51zcm|日韩永久精品大片www|天天综合丨国产丨精品入口

Green City Surveillance System

Resource: 本站Author: admin Date: 2017/4/13 Scan: 0

1, Engineering Overview 
Gun control system consists of front-end camera equipment, video equipment and the control room shows the composition of transmission lines, the system uses a large number of integrated components, in the lightning strike occurs, the transmission lines, electromagnetic field sensors to the mine produced over-voltage can be as high as several thousand volts, for integrated components have greater hazards. The transmission line monitoring system at the LPZ0A many of the non-mine area. System alignment stage, does not consider the wiring Yin Xiaxian maintain sufficient distance from the mine, which are the safe operation of the system leaving a hidden danger. 
Is generally believed that lightning protection measures segregation, and other potential, clamp, are pressure, filtering, shielding, over-voltage over-current protection, grounding and other methods will be lightning over-voltage, over-current and lightning electromagnetic pulse elimination in the device periphery, and thus effective protection of various equipment. At present mainly uses gas discharge tubes, discharge gap, high-frequency diodes, varistors, transient diodes, thyristors, high and low pass filters and other components, depending on frequency, power, transmission rate, impedance, VSWR, insertion loss, bandwidth , voltage, current, etc., combined into the power cord, Antenna, signal line Series Surge Protective Device (SPD) is installed in microelectronic devices for external circuits, the ground access system according to the principle of sharing the earth ground before will not cause a potential counter-attack. Only reasonable design, installation qualified, surge protector lightning can be an effective defense. 
Integrated lightning protection system designed mainly uses the following criteria for design reference. 
(1) IEC61024 "Building Lightning Protection" 
(2) IEC61312 "Lightning electromagnetic pulse protection," 
(3) ITU K25 "fiber optic cable lightning" 
(4) GB50343 "Building lightning protection of electronic information systems technical specifications" 
(5) GB50057-94 "Lightning Protection Code for Design of Buildings" 
(6) GB50174-93 "computer room design specification" 
(7) GB50200-94 "cable television systems engineering technical specifications" 
(8) GB50198-94 "Civil closed-circuit TV surveillance systems engineering technical specifications" 
(9) GB/T50311-2000 "building and architectural complex integrated wiring system design specification" 
Second, lightning protective measures 
(A) lightning directly stroke protection 
Surveillance system with PTZ camera front-end equipment, including guns, no gun PTZ cameras, these devices installed in the outdoors, more prone to lightning strikes, so you want to install anti-lightning directly stroke system, need to do an independent outdoor lightning protection grounding. According to the minimum equipment requirements, grounding resistance: R <4Ω. 
  
1, monitoring system, front-end equipment, lightning directly stroke protection measures 
(1) outdoor surveillance camera shot against lightning directly stroke facilities: in outdoor surveillance camera shot of the peak of the staff to install a lightning rod. Yin Xiaxian lightning rod to do the use of steel columns Discharge lines and in the pole base side and independent networks connected to ground lightning. Take pole height is 4 ~ 6 meters, lightning rod length is 1.5 to 2 meters, the use of ball method we can see the gun in the lightning protection of camera range. (See the next icon in the gun at the camera LPZ0B area.) 
  
(2) Outdoor camera gun grounding and ground network 
If the camera gun near the ground network, then the nearest ground wire to a nearby cited Grounding, if there is no way near the net, they should also 
The construction of independent outside network, ground network, the program is as follows: 
A, respectively, in the camera shots were planted around the pole grounding hot dip galvanized angle steel (5 × 50 × 50 × 2500mm), spacing of 5 meters. 
B, angle steel grounding pole with 4 × 40mm flat composed of network-connected ring network. 
C, the grounding system and the pole base connection. 
  
(3) ground network construction procedure: the pre-construction we must first fully understand the construction site topography, geological structure, and then design and on-site set of the holes around the grounding conductors and connection grooves, and then carry out construction and installation. Note that to avoid the cable trench, pipeline and other conductive devices, the construction unit pre-construction to submit a written application and agreed to start to proceed. (Design using the resistivity of the soil to take 250Ω · m.) 
A, Trenching: the rational use of digging tools, to dig under layer by layer method, a trench depth of at least 0.8 meters, in order to be able to deepen the groove width is appropriate. 
B, enter: use of appropriate tools to enter the angle grounding. Angle very depth of 0.8 meters below ground, that is grounding his head flat trench bottom. 
C, connections: to install the grounding a good angle with the 4 × 40mm flat connected to form a mesh; all the connections are used welding. 
D, the introduction of: the grounding system receives pole base. 
E, backfill: First fill in the Pure Land, layer by layer compaction, finishing a good road. 
Ground Grid Map 
(B) the lightning protection 
1, equipment front-end power protection of sensitive 
Lightning electromagnetic pulse (LEMP) induced electromotive force generated by intrusion-channel signal superimposed on the line to generate transient high voltage, destroying various types of electrical equipment and micro-chips, and therefore mine projects need to focus anti-lightning, 
An effective defense. In the design of an integrated mine when the channels should be more focus on protection, while making connections and sharing of equipotential grounding system. 
(1) front-end with a PTZ camera gun and lightning lightning protection measures: installation of modular front-end gun camera video, PTZ, power supply triple arrester 1, model: HD-CCTV-PVC / A. 
(2) front-end non-PTZ camera guns lightning lightning protection measures: installation of modular front-end gun camera video, power supply combo a lightning arrester, model: HD-CCTV-PV / A. 
(3) SPD grounding line: Lightning Protection Used for ≥ 2.5mm 2 insulated multi-strand copper wire directly to the soft yellow-green and ground connections, ground lines and used as a lightning directly stroke Yin Xiaxian one another insulation between the pole , and try to be short and straight. Grounding wire should be placed within the pole. 
  
2, transmission line protection 
The transmission line monitoring system mainly fiber, coaxial and twisted pair. Mine should be in the system for different transmission line separately in different protection. 
Optical fiber transmission line, because of itself is not a conductor of the lightning current is not sensitive, so do not consider the core line of lightning protection measures, but to strengthen the core should be grounded handle. 
Coaxial transmission line, when done, should be installed at both ends of coaxial transmission line surge arresters, and transmission lines to wear a steel pipe laid underground, at both ends of the pipe lines were grounded, do equipotential bonding; 
Twisted pair transmission line, when done, should be installed at both ends of transmission line surge arresters data signals, and transmission lines to wear a steel pipe laid underground, at both ends of the pipe lines were grounded, do equipotential bonding; 
  
3, transmission line routing 
Transmission line monitoring system is mainly the signal line and power cord. Outdoor camera power available from the terminal equipment at the introduction of, or from near the power to monitor the introduction. 
Control signal transmission line and the alarm signal transmission line is generally used Copper shielded cord, set up (or laying) in the front-end and end - 
Between the end. 
Part of the proposed transmission line with a shield to wear steel cable or buried cable laying, maintaining the electrical connection pipe, so that pairs of protective electromagnetic interference and electromagnetic induction more effective. Wearing a metal tube such as a cable whole difficulty, they can enter the terminal and the cable front-end equipment, the former wearing a metal pipe buried in the introduction, but buried not less than 15 meters in length, in-home end of the cable metal jacket, steel pipe with the lightning protection grounding device connected. When conditions allowed, the communication pipe or overhead can be used at this time transmission cables and other lines of the minimum spacing of their groove and with other lines of the minimum vertical distance between poles, reference may be GB50198-94 "Civil Engineering closed-circuit TV surveillance technical specifications "to be laid. Such as: transmission cable and 220V AC electrical wiring of ditch (tunnel) at a minimum spacing of 0.5 m, and communication cables minimum spacing 0.1 m; transmission cable with a total of 1 ~ 10KV power line poles that the minimum vertical spacing of 2.5 m, 1KV The following power-line minimum vertical spacing 1.5 m, and broadcasting the minimum vertical spacing of lines 1.0 m, and communication lines the minimum vertical spacing of 0.6 m. 
From mine point of view, sets of metal pipe laying method is best lightning protection, overhead lines are most vulnerable to lightning, and devastating large, spread wide, the first end of the device in order to avoid damage to overhead lines for transmission should be in each pole do ground handling, overhead lines and overhead cables hanging cable lines should be grounded in the metal pipe. 
  
4, control room equipment, lightning protection 
The main control room equipment, including monitoring center computers, video matrix, hard disk recorders, intercom systems, and power control center and so on. 
Monitoring system equipment room location should be selected in the LPZ of the most advanced areas and to avoid the top three floors located within the building; days when the building part of the lightning surface grid size does not meet the requirements of anti-jamming, it should face the days to install shield. Use of non-shielded cable, households before wearing metal pipe and buried in land in the horizontal distance of 10 meters. Who is subjected to conditions not to wear metal pipe buried in households, households should be extended the length of shielding tube or trestle, metal tube or both ends of the trestle bridge and in the lightning protection zone at the junction of equipotential bonding and grounding to be done. Control system equipment for the metal shell, the application of the shortest wire to connect it with other potential band connection. The case of non-metallic shell, shielding the building when the equipment is located does not meet the equipment, electromagnetic compatibility requirements, should be retrofitted with metal mesh or other shield the equipment shielding, metal net should be equipotential bonding equipotential bonding bands. Computer, communication, 
Control room equipment and buildings should be about 1 m from the external walls of protection. When lightning directly stroke in order to prevent the building being leaked into the ground along the wall generate strong electromagnetic fields around the Yin Xiaxian damage microelectronic devices. 
  
(1) power system control center of the lightning protection measures 
Because 70% of lightning strike is a high-voltage power line from the intrusion, in order to ensure the safety of equipment and general power supply should be set three lightning protection. 
a. In the control room where the building to install a total distribution box-type three-phase surge protector, pass flow capacity of 80KA (waveform 8/20μs), Model: HD-D380B-XL80, as the power supply first-class protection. 
b. Sub-electric box in the control room to install three-phase (single phase) power surge protector, the biggest Flow capacity 40KA, Model: HD-D380C-XS40, as a second-level protection. 
c. In the control room or monitoring equipment, UPS power supply installed before the series of single-phase UPS arrester, model: HD-UPSC4 / 4, parallel installation, power ≤ 5KW, with LC filter, low residual voltage output, as a third-level protection of power lines . 
d. control room equipment before the installation of Flow capacity 10KA single-phase mine socket, model: HD-D220CZ, as a fine power lightning protection, power clamp and filter. 
  
(2) The control room control, intercom system, lightning protection measures 
a. control room video using 16 modular video arrester to protect the DVR video input port will not be Jihuai surge voltage, model: HD-XH-16GVD / A. Optical fiber transmission signals from the gun camera video, which do not consider the installation of surge arresters. 
b. DVR with RS232 interface, RS232 interface, surge arresters to protect the hard disk video recorder serial port will not be Jihuai surge voltage, model: HD-XNET-D9. 
c. All access to the control room of the control circuit installed control circuit arrester, model: HD-XC-YT / A. 
d. wired intercom system is installed audio line arrester, model: HD-XH-GVD / A, only the host end of the installation of surge arresters intercom. 
Lightning monitoring system diagram (omitted) 

Monitoring system lightning protection grounding diagram (omitted) 
               
3, shielding measures 
1, underground lines, wires, pipes, PE lines and information lines of metal skin should be well grounded in-home side. Such as overhead or non-home pre-screened who should take in before the 20-meter indoor side pipe shield wire sets, and to shield connected with the mine to secure. 
2, control room, should be metal computer desks, computer equipment, control equipment, lightning protection earthing metal shell and reliable connection. 
3, outdoor camera gun to the decoder signal lines between the exposed and should set stainless steel or copper metal tube, and video and decoding of the gun metal shield enclosure 
Metal shielding shell and the pole Yin Xiaxian reliable connection. 
4, shielding to reduce electromagnetic interference with the basic measures, should adopt the following measures: external shielding measures, the line laid in the right path, the line 
Shielding, appropriate combination of these measures. 
5, in order to improve the electromagnetic environment, all the buildings together with the large-size metal parts should be equipotential bonding together and connected with the grounding device. The roof of metal surfaces, metal surface elevation, concrete and metal doors and windows inside the steel framework for equipotential grounding must be carried out. 
6, in the need to protect the space, when using shielded cable, at least at both ends of the shield, and should do so in the lightning protection zone at the junction of equipotential connection. When the microelectronic devices the system requirements to do so only at one end of the potential connection, you can wear a metal pipe into shielded cable, metal pipe at one end so Equipotential. 
7, building the connection between the cable should be laid in metal pipes, these metal pipes from one end to the other side of the electrical linking should be across the board, and connected to various buildings and other potential connections bring. Cable shield should be connected to the belt. 
8, in practice the building or room in the large space shield is supported by metal objects, metal frame or reinforced concrete, reinforced the composition of these natural elements. These elements constitute a large space shield-shaped grille. Penetration of such shielding conductive metal objects should be nearest connected to ground potential to do so. 
  
4, equipotential ground connection and sharing 
A, equipotential bonding is important in modern mine technology, the protective measures. Will enter the control center building, the shielding layer of various types of pipelines, machinery, etc., etc. before entering the building connected to ground potential. Again before entering the device connected to equipotential ground second. Outdoor camera output of the outer layer of the coaxial cable and other lines entering the building before the outer equipotential ground connection. 
2, the outer conductive devices separate equipotential bonding conductor after the grounding to reduce the system equipment is located in the building of metal structures and equipment or between equipment and devices due to lightning potential difference generated. The use of reinforced concrete structure of the building to connect all metal components to build a three-dimensional multi-connected network is to achieve the best choice for equipotential connection. To facilitate the isoelectric 
Bit connection construction, should be embedded in some places reserved for pieces of equipotential connection. 
3, into the system of building various types of plumbing, heating and air conditioning ducts and other metal pipe metal outer office into the building should be done in the isoelectric 
Digital connections, gas pipelines, after households should be inserted in the flange connections at both ends of an insulated connection with the switching SPD may participate in indoor metal pipe equipotential bonding, and combined with the building of large-sized metal pieces to connect together, according to the requirements of GB50054 to do equipotential bonding, the access to the General equipotential bonding zone, and reliable ground connectivity. 
4, in the building entrance, that is, LPZ0B with LPZ1 area at the junction of Main Equipotential connected to ground, in the follow-up of the lightning protection zone at the junction of the total equipotential bonding according to the methods of local equipotential bonding, connecting the main body should include the system equipment itself (including the exposed conductive parts may be), PE lines, cabinets, racks, electrical and electronic equipment enclosure, DC workplace, anti-static grounding, the outer metal shield cable, pipe, shielding slots, Surge SPD grounding protection, etc. shall be the shortest distance from the nearest equipotential connection with this band direct connection. Basic approach should be used to connect network-based (M) structure, or star-shaped (S) structure. Net-type structure with a circular equipotential connection should be through the building wall at intervals of 5 meters of internal reinforcement, metal facade to connect with the grounding system. When using S-bonding network, the system of all metal components except in ground reference point, that is, ERP Department connections, should be common ground with the various components of the system has enough insulation (more than 10KV, 1.2 / 50μs). 
5, arrester connecting lead should be short and straight, SPD connecting wires should not be greater than 0.5 meters, when the length is greater than 0.5 meters should be an appropriate bold diameter. 
6, the use of metal-containing components of the fiber optic cable, such as the tensile strength for the strengthening metal core, metal wave-layer, anti-rodent maintenance or repair of the outer layer of metal to use and reliable communication facilities, etc. shall be grounded, should be connected all the fiber optic cable along the connectors, etc. The tidal regenerator layer (metal layer), and the length of each side of the fiber optic cable directly to grounding terminals.

0
Home
Tel
Message
Contact
九九精品在线播放| 精品国产三级a| 欧美国产日韩一区二区三区| 国产视频在线免费观看| 免费毛片基地| 99热精品在线| 日韩在线观看视频网站| 国产成a人片在线观看视频 | 欧美a级片视频| 二级片在线观看| 久草免费资源| 国产麻豆精品| 国产视频在线免费观看| 精品毛片视频| 黄视频网站免费看| 精品视频在线观看免费 | 欧美a级成人淫片免费看| 色综合久久手机在线| 91麻豆国产福利精品| 欧美a级片免费看| 91麻豆爱豆果冻天美星空| 精品国产香蕉在线播出| 二级特黄绝大片免费视频大片| 国产一区二区精品尤物| 国产欧美精品午夜在线播放| 超级乱淫伦动漫| 午夜在线观看视频免费 成人| 日韩在线观看免费完整版视频| 麻豆午夜视频| 国产亚洲精品成人a在线| 日日爽天天| 韩国毛片| 久久99中文字幕久久| 国产国产人免费视频成69堂| 欧美另类videosbestsex久久| 四虎久久影院| 99色视频| 国产不卡精品一区二区三区| 欧美18性精品| 国产a毛片| 亚飞与亚基在线观看| 国产国语对白一级毛片| 日韩男人天堂| 日本伦理网站| 国产成人精品综合在线| 91麻豆精品国产综合久久久| 天天色成人| 九九久久99| 日韩一级黄色大片| 91麻豆精品国产综合久久久| 久久久久久久男人的天堂| 九九九在线视频| 一级毛片看真人在线视频| 成人高清视频免费观看| 亚洲女人国产香蕉久久精品| 日韩在线观看免费| 国产精品自拍在线| 欧美激情一区二区三区视频 | 黄视频网站在线看| 精品国产一区二区三区久久久蜜臀 | 青青青草视频在线观看| 国产一区二区精品尤物| 国产a毛片| 国产视频网站在线观看| 午夜激情视频在线观看| 国产91精品一区| 国产一级生活片| 国产成a人片在线观看视频| 欧美另类videosbestsex| 日韩专区亚洲综合久久| 深夜做爰性大片中文| 亚洲精品永久一区| 欧美大片一区| 国产视频在线免费观看| 欧美国产日韩精品| 国产网站免费观看| 国产一区免费在线观看| 国产91视频网| 日本在线不卡视频| 欧美一级视| 国产91精品一区| 麻豆网站在线看| 91麻豆精品国产自产在线| 午夜在线影院| 九九九网站| 国产亚洲免费观看| 国产一区二区精品| 日本伦理片网站| 一本伊大人香蕉高清在线观看| 国产激情视频在线观看| 黄视频网站免费观看| 超级乱淫伦动漫| 免费一级片网站| 韩国毛片| 亚洲爆爽| 韩国毛片 免费| 91麻豆精品国产自产在线| 尤物视频网站在线| 九九久久国产精品| 精品国产香蕉在线播出| 久久精品成人一区二区三区| 免费毛片基地| 欧美激情一区二区三区在线播放 | 日韩一级精品视频在线观看| 你懂的日韩| 亚欧视频在线| 国产一区二区精品| 欧美a级片视频| 久久久久久久免费视频| 精品国产亚洲人成在线| 欧美大片aaaa一级毛片| 亚飞与亚基在线观看| 国产a免费观看| 欧美一级视| 久久成人综合网| 久久国产影院| 精品久久久久久中文字幕一区| 免费国产在线观看| 999精品影视在线观看| 国产原创中文字幕| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 国产91精品系列在线观看| a级黄色毛片免费播放视频| 亚洲天堂免费| 久久国产影院| 国产视频一区二区在线播放| 青青青草影院| 久久国产一区二区| 一级片免费在线观看视频| 一 级 黄 中国色 片| 成人免费高清视频| 一级片片| 精品视频在线观看一区二区| 91麻豆精品国产自产在线 | 日本特黄特黄aaaaa大片| 亚洲第一页色| 韩国三级视频网站| 久久精品免视看国产明星| 四虎久久精品国产| 精品在线视频播放| 欧美激情一区二区三区视频 | 999久久狠狠免费精品| 999精品视频在线| 欧美a免费| 日本免费乱理伦片在线观看2018| 可以免费看污视频的网站| 色综合久久天天综合绕观看| 91麻豆国产福利精品| 国产一区二区高清视频| 中文字幕一区二区三区 精品| 亚洲精品久久玖玖玖玖| 欧美另类videosbestsex视频 | 免费一级片网站| 久久久成人网| 精品国产一区二区三区久久久蜜臀| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 青青久久精品| 999久久狠狠免费精品| 青青久久精品| 国产一区二区精品尤物| 国产精品免费精品自在线观看| 91麻豆精品国产自产在线观看一区 | 精品视频一区二区三区| 韩国毛片| 天天做日日爱| 九九九在线视频| 日韩男人天堂| 精品国产一区二区三区久久久蜜臀| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | a级精品九九九大片免费看| 国产91精品一区| 国产精品免费久久| 亚欧成人毛片一区二区三区四区| 久久99中文字幕| 国产不卡福利| 日韩一级黄色| 精品国产一区二区三区久| 精品国产亚洲人成在线| 欧美国产日韩在线| 精品久久久久久中文字幕一区| 国产a视频| 九九国产| 中文字幕97| 午夜家庭影院| 国产成人欧美一区二区三区的| 国产精品自拍在线| 国产麻豆精品| 国产麻豆精品免费密入口| 国产成人啪精品视频免费软件| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 久草免费在线观看| 成人免费网站久久久| 91麻豆精品国产片在线观看| 欧美激情一区二区三区在线| 黄视频网站在线免费观看| 亚洲精品久久玖玖玖玖| 国产网站免费视频| 毛片高清| 久久久成人网|